Current through Register Vol. 54, No. 45, November 9, 2024
Section 127.201 - General requirements(a) A person may not cause or permit the construction or modification of an air contamination facility in a nonattainment area or having an impact on a nonattainment area unless the Department or an approved local air pollution control agency has determined that the requirements of this subchapter have been met.(b) The nonattainment area classification that applies for offset trading and offset ratio selection shall be the highest classification designated by the EPA Administrator in 40 CFR 81.339 (relating to Pennsylvania) or by operation of law.(c) The NSR requirements of this subchapter also apply to a facility located in an attainment area for ozone and within an ozone transport region that emits or has the potential to emit at least 50 TPY of VOC or 100 TPY of NOx. A facility within either an unclassifiable/attainment area for ozone or within a marginal or incomplete data nonattainment area for ozone or within a basic nonattainment area for ozone and located within an ozone transport region will be considered a major facility and shall be subject to the requirements applicable to a major facility located in a moderate nonattainment area.(d) The NSR requirements of this subchapter apply to an owner or operator of a facility at which a net emissions increase that is significant would occur as determined in accordance with § 127.203a (relating to applicability determination). If an emissions increase meets or exceeds the applicable emissions rate that is significant as defined in § 121.1 (relating to definitions), the facility is subject to the permitting requirements under § 127.205 (relating to special permit requirements). An emissions increase subject to this subchapter must also be offset through the use of ERCs at the offset ratios specified in § 127.210 (relating to offset ratios). The generation, use, transfer and registration requirements for ERCs are listed in §§ 127.206-127.209.(e) In the event of an inconsistency between this rule and any other rule promulgated by the Department, the inconsistency must be resolved by the application of the more stringent provision, term, condition, method or rule.(f) A facility located in Bucks, Chester, Delaware, Montgomery or Philadelphia Counties that emits or has the potential to emit at least 25 TPY of VOC or NOx will be considered a major facility and shall be subject to the requirements applicable to a major facility located in a severe nonattainment area for ozone.(g) PM2.5 and PM-10 emissions include gaseous emissions from a facility or activity that condense to form PM at ambient temperatures, if present, in accordance with the following requirements: (1) Beginning January 1, 2011, or an earlier date established by the Administrator of the EPA, condensable PM shall be accounted for in applicability determinations and for PM2.5 and PM-10 emission limitations established in a plan approval or operating permit issued under this chapter.(2) Compliance with emissions limitations for PM2.5 and PM-10 issued prior to January 1, 2011, or an earlier date established by the Administrator, may not be based on condensable PM unless required by the terms and conditions of a plan approval, operating permit or the SIP.(3) Applicability determinations made prior to January 1, 2011, or an earlier date established by the Administrator, without accounting for condensable PM may not be considered in violation of this subchapter unless the applicable plan approval, operating permit or SIP includes requirements for condensable PM.The provisions of this §127.201 amended May 18, 2007, effective 5/19/2007, 37 Pa.B. 2385; amended September 2, 2011, effective 9/3/2011, 41 Pa.B. 4761. This section cited in 25 Pa. Code § 121.1 (relating to definitions).