Distance (D), from the blasting site, in feet | Maximum allow-able peak particle velocity (Vmax) for ground vibration, in inches/second1 | Scaled-distance factor to be applied without seismic monitoring (Ds)2 |
0 to 300 | 1.25 | 50 |
301 to 5,000 | 1.00 | 55 |
5,001 and beyond | .75 | 65 |
1Ground vibration shall be measured as the particle velocity. Particle velocity shall be recorded in three mutually perpendicular directions. The maximum allowable peak particle velocity shall apply to each of the three measurements.
2Applicable to the scaled-distance equation of subsection (j).
25 Pa. Code § 87.127
The provisions of this § 87.127 amended under the Surface Mining Conservation and Reclamation Act (52 P. S. §§ 1396.1-1396.19a); The Clean Streams Law (35 P. S. §§ 691.1-691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20); amended under section 4.2 of the Surface Mining Conservation and Reclamation Act (52 P. S. § 1396.4b); section 11 of the Noncoal Surface Mining Conservation and Reclamation Act (52 P. S. § 3311); and sections 1917-A and 1920-A of The Administrative Code of 1929 (71 P. S. §§ 510-17 and 510-20).
This section cited in 25 Pa. Code § 87.64 (relating to blasting plan); 25 Pa. Code § 87.76 (relating to surface mining near underground mining); 25 Pa. Code § 87.92 (relating to signs and markers); 25 Pa. Code § 90.43 (relating to blasting plan); 25 Pa. Code § 90.92 (relating to signs and markers); and 25 Pa. Code § 90.148 (relating to blasting).