Or. Admin. Code § 741-320-0170

Current through Register Vol. 63, No. 12, December 1, 2024
Section 741-320-0170 - Walkways for Trackside Warning Devices

A walkway conforming to OAR 741-320-0080 (Standard No. 1) or 741-320-0130 (Walkways on Structures) as appropriate, shall be constructed and maintained, upon order of the Department, for such distance and in each location as is necessary to facilitate inspection of a train stopped by a trackside warning device, only after notice to the affected railroad and hearing (in case of dispute).

NOTE: The Department may order the walkways prescribed in this rule only after notice to the affected railroad and hearing (in case of dispute).

Or. Admin. Code § 741-320-0170

PUC 13-1981, f. & ef. 12-21-81 (Order No. 81-900); PUC 4-1983, f. & ef. 5-3-83 (Order No. 83-242); RS 2-1996, f. & cert. ef. 3-14-96; Renumbered from 860-044-0342; RS 2-1998, f. & cert. ef. 8-20-98

Stat. Auth.: ORS 184.616, ORS 184.619, ORS 823.011 & ORS 824.056

Stats. Implemented: ORS 824.050 & ORS 824.056