Section 734-055-0090 - Specific Construction Details(1) Corrugated metal pipe and concrete pipe used as a conduit or casing pipe or a gravity flow carrier pipe shall as a minimum conform to requirement of the Department's current issue of "Standard Specifications for Highway Construction". Smooth iron or steel pipe used as a conduit or casing pipe shall be the standard type used for pressure pipe.(2) No trench shall be excavated with a top width in excess of 18 inches more than the outside diameter of the pipe, conduit, or cable to be installed unless permission is first obtained from the DM.(3) All underground installations shall be buried a minimum of 30 inches unless permission is first obtained from the DM.(4) Aerial utilities crossing the roadway of the highway shall have a minimum vertical clearance of 18 feet.(5) The backfilling of all trenches and tunnels must be accomplished immediately after the facility authorized by the permit has been placed therein and must be fully compacted to produce a density in place of not less than 95 percent of relative maximum density.(6) All debris, refuse and waste of all kinds, which may have accumulated upon the highway right-of-way by reason of the activity of applicant shall be removed immediately upon completion of the said activity, and the said highway right-of-way must be restored to at least as good a condition as it was prior to such activity.(7) Unless special permission is first obtained from the DM, direct burial of cable placed by the plowing method shall be limited to areas outside the roadway of the highway.(8) Standard warning signs for buried power or communications cable and for pipe lines carrying gas or flammable liquids shall be placed at each crossing under the highway and at intervals along longitudinal installations as required by current Public Utility Commissioner's Order or as specified by the DM: (a) Signs shall be placed as near the right-of-way line as practical;(b) No signs shall be placed between the guardrail and the highway roadway.(9) Pedestals installed as part of a buried cable installation are to be located one foot from the right-of-way line unless special permission is obtained from the DM to locate elsewhere. In no case shall the pedestals be located within the highway maintenance operating area, including mowing operations, or nearer the pavement edge than any official, highway sign in the same general location. (10) The buried cable or pipe depth shown on the permit form represents the distance from the top of the surface or ground line to the top of the cable or pipe.(11) Applicant shall not spray with selective herbicides, cut or trim trees or shrubs growing on the highway right-of-way unless and until written permission and instructions to do so have first been obtained from the DM.(12) All material installed within highway right-of-way shall be durable and designed for long service life expectancy and shall be relatively free of routine servicing and maintenance requirements.Or. Admin. Code § 734-055-0090
HWY 6-1989, f. & cert. ef. 10-25-89Publications: The publication(s) referred to or incorporated by reference in this rule are available from the agency.
Stat. Auth.: ORS 184 & ORS 374
Stats. Implemented: ORS 374.305