Current through Register Vol. 63, No. 12, December 1, 2024
Section 333-062-0105 - Piping(1) Spa pool recirculation piping shall be sized to carry the following maximum design flows: (a) Discharge piping (except copper) -- 10 ft./sec. (3.05 m/sec.);(b) Discharge piping (copper) -- 8 ft./sec. (2.44 m/sec.);(c) Suction velocity -- 6 ft./sec. (1.83m/sec.).(2) Pool recirculation piping, if plastic, shall comply with National Sanitation Foundation Standard Number 14 for Plastic Piping System Components and Related Materials.(3) Spa pool backwash and/or drain lines shall be permanently piped with an air break. For all spa pools built after May 1, 1986, the pool backwash and/or drain line shall be permanently piped with an air break to discharge into an approved sewerage system.Or. Admin. Code § 333-062-0105
HD 14-1980(Temp), f. & ef. 12-19-80; HD 8-1981, f. & ef. 6-23-81; Renumbered from 333-042-0400; HD 23-1994, f. 8-22-94, cert. ef. 9-1-94Publications: Publications referenced are available from the agency.
Stat. Auth.: ORS 448.011
Stats. Implemented: ORS 448.011