Current through Register Vol. 63, No. 12, December 1, 2024
Section 141-093-0195 - Jackson County Vernal Pools - Eligibility Requirements(1) Project Location. To be eligible for this GP, the project must be located within the geographic area of Agate-Winlo soils. This area generally conforms to the boundaries of the Agate-Winlo soil map unit as mapped by the Natural Resources Conservation Service's Jackson County soil survey.(2) Type of Water. This GP authorizes removal-fill activities only in vernal pool wetlands and the following other waters that occur in Agate-Winlo soils: (a) Ditches or other water conveyance structures constructed solely to drain vernal pool lands;(b) Roadside ditches that are not part of a stream tributary system;(c) Channels excavated through uplands for irrigation water and return flows; and(d) Palustrine emergent wetlands that were historically vernal pool wetlands.(3) Thresholds. To be eligible, a project must meet both of the following:(a) Impacts to vernal pool wetlands and other waters must be less than two acres; and(b) Impacts to VPC must be less than 15 acres.(4) Mitigation. Mitigation must be accomplished in accordance with OAR 141-093-0200.Or. Admin. Code § 141-093-0195
DSL 1-2012, f. 3-14-12, cert. ef. 4-1-12; DSL 56-2018, minor correction filed 01/05/2018, effective 1/5/2018Statutory/Other Authority: ORS 196.600 - 196.692 & 196.795 - 196.990
Statutes/Other Implemented: ORS 196.600 - 196.692 & 196.795 - 196.990