Subchapter 5 - Performance Standards
- Section 460:30-5-1 - Scope
- Section 460:30-5-2 - Objectives
- Section 460:30-5-3 - Signs and markers
- Section 460:30-5-4 - Management of drilled holes
- Section 460:30-5-5 - Topsoil and subsoil
- Section 460:30-5-6 - Hydrologic balance protection: General
- Section 460:30-5-7 - Flood-prone areas
- Section 460:30-5-8 - Hydrologic balance: Effluent limitations
- Section 460:30-5-9 - Hydrologic balance: Sediment control measures
- Section 460:30-5-10 - Hydrologic balance: Diversions
- Section 460:30-5-11 - Hydrologic balance: Monitoring
- Section 460:30-5-12 - Hydrologic balance: Wetlands
- Section 460:30-5-13 - Hydrologic balance: Impoundments
- Section 460:30-5-14 - CCB placement: General requirements
- Section 460:30-5-15 - CCB placement: Fugitive dust control
- Section 460:30-5-16 - CCB placement: Intermediate cover
- Section 460:30-5-17 - Hazardous and solid wastes
- Section 460:30-5-18 - Reclamation: General requirements
- Section 460:30-5-19 - Reclamation: Final cover
- Section 460:30-5-20 - Reclamation: Slope stability
- Section 460:30-5-21 - Reclamation: Revegetation
- Section 460:30-5-22 - Cessation of operations: Temporary
- Section 460:30-5-23 - Roads
- Section 460:30-5-24 - Utility installations
- Section 460:30-5-25 - CCB Placement Reporting