Section 252:517-15-4 - Final closure(a)DEQ approval required. The DEQ must approve the final closure of a CCR unit before the post-closure period can begin.(b)Extension of closure period. The DEQ may extend the closure period and require the posting of additional financial assurance if: (1) any testing shows the confirmed presence of elevated levels of any constituent;(2) any evidence of contamination related to site operations has been found; or(3) final closure of the site is found to be inadequate.Okla. Admin. Code § 252:517-15-4
Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016