Current through all regulations passed and filed through November 4, 2024
Section 3745-256-56 - Open-ended valves or lines - equipment leaks(A)(1) Each open-ended valve or line shall be equipped with a cap, blind flange, plug, or a second valve.(2) The cap, blind flange, plug, or second valve shall seal the open end at all times except during operations requiring hazardous waste stream flow through the open-ended valve or line.(B) Each open-ended valve or line equipped with a second valve shall be operated in a manner such that the valve on the hazardous waste stream end is closed before the second valve is closed.(C) When a double block and bleed system is being used, the bleed valve or line may remain open during operations that require venting the line between the block valves but shall comply with paragraph (A) of this rule at all other times.Ohio Admin. Code 3745-256-56
Effective: 6/12/2023
Five Year Review (FYR) Dates: Exempt
Promulgated Under: 119.03
Statutory Authority: 3734.12
Rule Amplifies: 3734.12