Ohio Admin. Code 1501:14-3-07

Current through all regulations passed and filed through December 9, 2024
Section 1501:14-3-07 - Final highwalls

To insure public safety when highwalls are retained as part of the intended future use, the operator shall:

(A) Design the procedures to detonate explosives in a manner that the final highwall will not be fractured to an unstable condition;
(B) Stabilize any unstable final highwalls;
(1) Lime mining waste used to backfill highwalls. An angle of eighteen degrees or less, in accordance with paragraph (A) of rule 1501:14-3-06 of the Administrative Code, from the top of the highwall to the quarry floor is acceptable with a minimum of four feet of non-toxic earthen material covering the submerged slope, with an additional six inches of topsoil used to cap any exposed slope, then planted to a diverse vegetative cover in accordance with Chapter 1501:14-3 of the Administrative Code. An alternative plan for cover or treatment may be approved by the chief based upon a showing by the applicant that, at a minimum, the alternative plan is as effective as four feet of cover for protecting water quality and sustaining vegetative growth.
(C) Provide egress from the pit area;
(D) Restrict access to the highwall as approached from the top; and
(E) Perform other measures as are necessary to insure public safety because of the particular site conditions.

Ohio Admin. Code 1501:14-3-07

Effective: 2/1/2024
Five Year Review (FYR) Dates: 11/15/2023 and 02/01/2029
Promulgated Under: 119.03
Statutory Authority: 1514.08, 1514.081, 1514.12
Rule Amplifies: 1514.011, 1514.02, 1514.081, 1514.12
Prior Effective Dates: 03/24/1975, 08/01/2005, 10/06/2011