At the time temporary diversions are removed, the permittee shall ensure that downstream water treatment facilities previously protected by the diversion are modified or removed to prevent over-topping or failure of the facilities.
General Authority: NDCC 28-32-02, 61-02-11, 61-03-13
Law Implemented: NDCC 61-02-14, 61-16.1-38
N.D. Admin Code 89-04-06-02