The owner or user shall prepare a boiler subject to regular inspections for such inspections or hydrostatic tests when notified by the inspector. The owner or user shall prepare each boiler for internal inspection and shall prepare for and apply the hydrostatic test whenever necessary, on the date specified by the inspector, which may not be less than seven days after the date of notification.
N.D. Admin Code 33.1-14-03-01
General Authority: NDCC 23.1-16
Law Implemented: NDCC 23.1-16