N.D. Admin. Code 33.1-14-02-05

Current through Supplement No. 395, January, 2025
Section 33.1-14-02-05 - Defective conditions disclosed at time of external inspections

If upon an external inspection there is evidence of a leak or crack, enough of the covering of the boiler must be removed to satisfy the inspector, in order that the inspector may determine the safety of the boiler. If the covering cannot be removed at that time, the inspector may order the operation of the boiler stopped until the covering can be removed and proper examination can be made.

N.D. Admin Code 33.1-14-02-05

Adopted by Administrative Rules Supplement 2020-377, July 2020, effective 7/1/2020.

General Authority: NDCC 23.1-16

Law Implemented: NDCC 23.1-16