04 N.C. Admin. Code 11 R06-20

Current through Register Vol. 39, No. 9, November 1, 2024
Section 11 R06-20 - REQUIREMENT FOR GOOD ENGINEERING PRACTICE

The gas plant of the utility shall be constructed, installed, maintained and operated in accordance with accepted good engineering practice in the gas industry to assure, as far as reasonably possible, continuity of service, uniformity in the quality of service furnished, and the safety of persons and property.

04 N.C. Admin. Code 11 R06-20