Section 41B .0507 - PROPOSAL EVALUATION(a) Evaluation criteria shall include those specified by G.S. 143-64.17A(b) and (d).(b) Evaluation criteria for the proposal shall also include the following:(1) Life cycle cost analysis as defined in G.S. 143-64.15.(2) Certification by a registered engineer that the measurement and verification protocol presented in the proposal is capable of measuring actual or projected savings.(3) A process of annual third party measurement and verification of savings in accordance with the pre-defined and certified protocol found in 01 NCAC 41B .0510. The cost of this process shall be included in the total cost of the contract.(4) The total cost based on Office of Treasurer cost of financing estimate and cost based on Qualified Provider or third party financing in the response.01 N.C. Admin. Code 41B .0507
Authority G.S. 143-64.17F; 143-64.17H;
Temporary Adoption Eff. August 1, 2003;
Temporary Adoption Expired April 27, 2004;
Eff. July 1, 2004;
Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. March 6, 2018.Authority G.S. 143-64.17F; 143-64.17H;
Temporary Adoption Eff. August 1, 2003;
Temporary Adoption Expired April 27, 2004;
Eff. July 1, 2004.