N.Y. Comp. Codes R. & Regs. Tit. 16 § 197.21
Class D utilities are required to include the costs set forth in subdivision (e), paragraphs (2), (4), (6), (7), (8), (9), (10), and (11) only for major construction projects.
N.Y. Comp. Codes R. & Regs. Tit. 16 § 197.21
Class D utilities are required to include the costs set forth in subdivision (e), paragraphs (2), (4), (6), (7), (8), (9), (10), and (11) only for major construction projects.