Part 20 - FUGITIVE DUST CONTROL
- Section 20.11.20.1 - ISSUING AGENCY
- Section 20.11.20.2 - SCOPE
- Section 20.11.20.3 - STATUTORY AUTHORITY
- Section 20.11.20.4 - DURATION
- Section 20.11.20.5 - EFFECTIVE DATE
- Section 20.11.20.6 - OBJECTIVE
- Section 20.11.20.7 - DEFINITIONS
- Section 20.11.20.8 - VARIANCES
- Section 20.11.20.9 - SAVINGS CLAUSE
- Section 20.11.20.10 - SEVERABILITY
- Section 20.11.20.11 - DOCUMENTS
- Section 20.11.20.12 - GENERAL PROVISIONS
- Section 20.11.20.13 - FUGITIVE DUST CONTROL PROGRAMMATIC PERMITS
- Section 20.11.20.14 - FUGITIVE DUST CONTROL CONSTRUCTION PERMITS
- Section 20.11.20.15 - FUGITIVE DUST CONTROL CONSTRUCTION PERMITS; MINIMUM PERMIT APPLICATION REQUIREMENTS
- Section 20.11.20.16 - HIGH WIND EVENT REQUIREMENTS; HIGH WIND EVENT AFFIRMATIVE DEFENSE
- Section 20.11.20.17 - FILING, REVIEW AND INSPECTION FEES
- Section 20.11.20.18 - FUGITIVE DUST CONTROL CONSTRUCTION PERMIT APPLICATION PROCESSING
- Section 20.11.20.19 - PUBLIC AND PRIVATE UNPAVED ROADWAYS, SHORT-CUTS AND UNPAVED PARKING AREAS
- Section 20.11.20.20 - ABRASIVE PRESSURE BLASTING OPERATIONS
- Section 20.11.20.21 - CONTROL OF GREENWASTE MATERIAL
- Section 20.11.20.22 - DEMOLITION AND RENOVATION ACTIVITIES; FUGITIVE DUST CONTROL CONSTRUCTION PERMIT AND ASBESTOS NOTIFICATION REQUIREMENTS
- Section 20.11.20.23 - REASONABLY AVAILABLE CONTROL MEASURES FOR FUGITIVE DUST
- Section 20.11.20.24 - NATIVE GRASS SEEDING AND MULCH SPECIFICATIONS
- Section 20.11.20.25 - REVIEW MEETING: TIMELY PETITION FOR HEARING BEFORE THE BOARD
- Section 20.11.20.26 - VISUAL DETERMINATION OF FUGITIVE DUST EMISSIONS
- Section 20.11.20.27 - ENFORCEMENT
- Section 20.11.20.28 - PUBLIC OUTREACH AND TRAINING
- Section 20.11.20.29 - COMPLAINTS