The state engineer will determine whether the circumstances necessitate an Underground Storage and Recovery Permit being limited in duration. If the state engineer limits the duration of a permit, a renewal shall be requested in writing by the permittee and filed with the state engineer at least one year prior to the expiration date of the permit. Failure to file the request for permit renewal in a timely manner may result in the expiration of the permit. A permit may be renewed multiple times. Upon expiration of a permit, the permittee has the right to withdraw all waters within storage that are recognized and approved by the state engineer as being recoverable.
N.M. Admin. Code § 19.25.8.26