Current through Register Vol. 56, No. 24, December 18, 2024
Section 8:33-5.3 - General requirements(a) Minimum information required for all expedited review projects shall consist of: 1. Project description, including changes in beds, total project cost, services affected, equipment involved, source of funds, utilization statistics, both inpatient and outpatient, and justification for the proposed project;2. The extent to which all residents of the area shall have access to services, particularly the medically underserved;3. Applicants for all services proposed for expedited review at N.J.A.C. 8:33-5.1(a), shall document that the following criteria shall be met: i. Appropriate licensing and construction standards; andii. Licensure track record requirements (N.J.A.C. 8:33-4.10(d) );4. Additionally, cardiac catheterization program and emergency or primary angioplasty applicants shall comply with all relevant sections of N.J.A.C. 8:33E; and5. Long-term acute care hospital applicants shall comply with all relevant sections of N.J.A.C. 8:33F and 8:43G-38.N.J. Admin. Code § 8:33-5.3
Amended by R.1996 d.101, effective 2/20/1996.
See: 27 N.J.R. 4179(a), 28 N.J.R. 1228(a).
Amended by R.2002 d.243, effective 8/5/2002.
See: 34 N.J.R. 458(a), 34 N.J.R. 2814(a).
Rewrote the section.
Amended by R.2008 d.23, effective 1/22/2008.
See: 39 N.J.R. 2709(a), 40 N.J.R. 620(b).
In (a)2 and (a)3ii, deleted "and" from the end; in (a)4, inserted "and emergency or primary angioplasty" and substituted "; and" for a period at the end; and added (a)5.