Current through Register Vol. 56, No. 23, December 2, 2024
Section 16:47-3.14 - Materials and workmanship(a) Construction within highway right-of-way is subject to inspection and approval by the Department.1. The work, as far as is practicable, must conform in quality and appearance to similar Department construction.2. Materials shall conform to the Department "Standard Specifications for Road and Bridge Construction", unless otherwise specified in this Access Code or in the permit.3. The Department may assign an inspector to the job whose time and expenses shall be charged to the permittee.(b) The cost of construction work and materials shall be entirely at the permittee's expense. The Department will not share in any expense or do any construction work pertaining to driveways.N.J. Admin. Code § 16:47-3.14