Current through November 25, 2024
Section 704.Sec. 11.1 - NEW1. Except as otherwise provided in section 14, affiliated utilities shall include an energy storage plan in the resource plan filed by the affiliated utilities. The energy storage plan must be consistent with the action plan and the distributed resources plan submitted by the affiliated utilities.2. The energy storage plan must include, without limitation: (a) A proposal by the affiliated utilities to meet or exceed the biennial energy storage targets that fall within the period covered by the action plan;(b) A summary of all energy storage system projects for which the affiliated utilities are seeking approval in the action plan or distributed resources plan of the affiliated utilities;(c) A description of how energy storage system resources are being modeled and considered in the existing planning process;(d) An evaluation of the costs and benefits of the deployment of energy storage, which must include, without limitation, a description of the affiliated utilities' cost-benefit analysis framework where benefits include all reductions in resource costs as well as cost savings associated with other services or alternatives that would otherwise have been procured. The cost-benefit analysis must include, without limitation: (1) Recent and relevant publicly available storage price and storage performance information; and(2) Findings from any relevant request for proposals, if applicable.Nev. Admin. Code § 704.Sec. 11.1
Added to NAC by Pub. Utilities Comm'n by R106-19A, eff. 5/21/2020NRS 703.025, 704.210, 704.796