Section 618.5105 - Application for permit: Content; incomplete or inaccurate documentation
1. To obtain a permit for the construction or alteration of an explosives manufacturing plant, a person must submit an application form to the Enforcement Section and make the following information available for review by the Administrator or a representative of the Administrator:
(a) A copy of the safety plan and procedures for the explosives manufacturing plant;
(b) A copy of the written safety program for the explosives manufacturing plant;
(c) A copy of the program for process safety management of highly hazardous chemicals;
(d) A map of a 1-mile radius surrounding the area of the explosives manufacturing plant, which identifies all:
(1) Inhabited buildings;
(2) Roadways;
(3) Railways; and
(4) Other buildings and areas where there may be people, including, without limitation, ranching operations;
(e) A plot plan of the explosives manufacturing plant that includes:
(1) A general layout of the explosives manufacturing plant;
(2) The location of each explosives manufacturing building within the explosives manufacturing plant with a description of:
(I) The types of explosives present in the building;
(II) The maximum quantity of each identified type of explosive; and
(III) The maximum number of employees who are present during the manufacturing operations;
(3) The location of each magazine in the explosives manufacturing plant;
(4) The location of all buildings, other than explosives manufacturing buildings, within the explosives manufacturing plant and a description of the uses of each such building; and
(5) The location and dimensions of all barricades within the explosives manufacturing plant;
(f) A copy of the building plans for each explosives manufacturing building within the explosives manufacturing plant, which include:
(1) Details and diagrams describing the materials used to construct the floors, walls, ceilings and roofs of each building, including the location and setup of revetment and blast walls;
(2) Electrical installations and fixtures, and diagrams describing locations, type and code designations of those installations and fixtures;
(3) Diagrams of the plumbing, including water supply, drains and grey water;
(4) Plans and diagrams of the ventilation of each building, including heating, ventilation and air-conditioning systems and local exhaust systems;
(5) Fire suppression systems, if installed;
(6) Lightning protection systems, if installed;
(7) Steam plant and steam distribution systems, if installed; and
(8) Detailed diagrams of the electrostatic discharge system, if installed; and
(g) A copy of the building plans for all buildings, other than explosives manufacturing buildings.
2. If the Enforcement Section receives incomplete or inaccurate documentation in an application package for a construction permit, the Enforcement Section shall notify the applicant for the permit in writing and inform him or her of the deficiencies. An applicant must correct the deficiencies within 30 days after being notified of the deficiencies.

Nev. Admin. Code § 618.5105

Added to NAC by Div. of Industrial Relations by R109-00, eff. 9-6-2001

NRS 618.295, 618.898