Nev. Admin. Code § 534A.212
Current through December 31, 2024
First Well | Each Subsequent Well of the Same Type | |
Production Well | $500 | $300 |
Injection Well | 500 | 300 |
Observation Well | 300 | 150 |
Thermal Gradient Well | 100 | 50 |
Nev. Admin. Code § 534A.212
First Well | Each Subsequent Well of the Same Type | |
Production Well | $500 | $300 |
Injection Well | 500 | 300 |
Observation Well | 300 | 150 |
Thermal Gradient Well | 100 | 50 |
Nev. Admin. Code § 534A.212