Section 445A.9618 - Inspection of construction during critical phases by design engineer; certificate of completion1. The design engineer shall inspect the construction of the proposed on-site sewage disposal system during critical phases of construction, including, without limitation, installation of the treatment unit, excavation of the absorption area and installation of the drain media or other effluent absorption system.2. The design engineer shall issue a certificate of completion for the on-site sewage disposal system when he or she determines that the system complies with all applicable requirements of NAC 445A.950 to 445A.9706, inclusive, and any additional conditions required by the Division or other administrative authority. The Division or other administrative authority may request that photographic documentation of the phases of construction be submitted together with the certificate of completion.3. A permit must not be issued until the certificate of completion, bearing the original stamp and signature of the design engineer, and the appropriate fees, if any, required pursuant to NAC 445A.963 or by an administrative authority have been received by the Division or other administrative authority.Nev. Admin. Code § 445A.9618
Added to NAC by Environmental Comm'n by R194-07, eff. 8-26-2008NRS 445A.425, 445A.430, 445A.475, 445A.500