Current through November 8, 2024
Section 353C.570 - Waiver of requirements of NRS 353C.1951. An agency that wishes to obtain a waiver of a requirement of NRS 353C.195 may submit a request for such a waiver to the State Controller.2. A request submitted pursuant to subsection 1 must:(a) Be in the form prescribed by the State Controller;(b) Specify each requirement of NRS 353C.195 from which the waiver is sought; and(c) Include: (1) A description of the resources that the agency has to engage in its own debt collection efforts; or(2) Other evidence of good cause for granting the waiver.3. A request submitted pursuant to subsection 1 may include, without limitation: (a) A description of the procedures that the agency uses to collect its own debts;(b) A statement of the success of the agency in collecting its own debts; and(c) A statement of the reasons why the agency contends that granting the waiver is likely to generate more net revenue for the State than if the request for the waiver is denied.4. The State Controller will condition the grant of a waiver upon an agency's agreement to certain conditions concerning methods and procedures for the collection of debts by the agency and for the assignment of the agency's debts to the State Controller for collection.5. The State Controller will notify the agency, in writing, of the grant or denial of the waiver. If the State Controller grants a waiver, the notice will set forth the terms of the waiver, including, without limitation, the conditions concerning methods and procedures for the collection of debts by the agency and for the assignment of the agency's debts to the State Controller for collection.6. The State Controller will review each waiver granted pursuant to NRS 353C.195 at least once each year and at any other time if the State Controller determines that there has been a material change in the circumstances upon which the waiver was granted.Nev. Admin. Code § 353C.570
Added to NAC by St. Controller by R079-09, eff. 10-15-2010