Current through September 17, 2024
Section 408-3-009 - OVERWEIGHT AND/OR OVERDIMENSIONAL PERMIT FEE SCHEDULE009.01 A permit fee will not be charged for the following movements or permits:009.01A The movement by any governmental agency, political subdivision or public corporation of their own vehicles or combination of vehicles, with or without load.009.01B The movement by a contractor of overdimensional construction materials, that cannot be reduced in size, from the nearest railroad siding to the site of a highway construction project.009.01C The movement of an overdimensional load or a self-propelled object from a railroad siding to the site of a highway construction project or to an equipment storage yard nearby.009.01D The operation or movement of a contractor's overweight and overdimensional equipment within the project limits of a highway construction project being built under traffic, or to and from the nearest railroad siding which is being used as a delivery point for equipment or materials.009.01E The towing of overlength vehicle combinations disabled on the highway to the nearest place of secure safekeeping.009.02 A permit fee will not be refunded after a permit is issued. No refund will be made if a permit is not used or if a permit is declared void because of a violation of the terms and conditions of the permit.009.03 A permit will not be issued until the permit fee has been paid or specific arrangements regarding payment have been made with the Department.009.04 Single trip permit fees for the movement of a vehicle or vehicle combination not exempted in Section 009.01 will be as follows: Single trip - Overdimensional Only = $ 15.00
Single trip - Overweight Only = $ 20.00
Single trip - Overweight and Overdimensional = $ 25.00
009.04A The fee for amending a permit shall be $ 10.00.009.04B No permit shall be amended if the amendment will change the type of permit requested, such as from a overdimensional only permit to an overdimensional and overweight permit.009.04C No permit shall be amended more than one time.009.05 The permit fee for any continuous local or statewide envelope permit shall be $ 25.00 for each ninety-day period, $ 50.00 for each one hundred eighty day period, $ 75.00 for each two hundred seventy day period and $ 100.00 for a one-year period.009.06 The permit fee for the following permits shall be as follows: 009.06A The permit fee for the movement of grain or other seasonally harvested products shall be $ 25.00 for a thirty-day permit. The permit may be renewable for a total number of days not to exceed 150 days per calendar year.009.06B The permit fee for the movement of garbage or refuse shall be $ 10.00 per month, not to exceed $ 100.00 per year.009.06C The permit fee for Interstate Implement of Husbandry Permits shall be $ 25.00 for each ninety-day period, but in no case more than $ 100.00 for a one-year period.009.06D The permit fee for a Baled Livestock Forage Interstate Permit shall be $ 25.00, and shall be valid for ninety days.009.06E There shall be no fee charged for Highway 75 Implement of Husbandry Permits.009.07 A Conditional Interstate Use Permit fee shall be $ 10.00 for each ten-day increment up to a maximum of $ 90.00 for 90 days. No refund of the permit fee will be allowed if the permit is revoked or unused, regardless of reason for such revocation or lack of use. A Conditional Interstate Use Permit will not be issued until the permit fee is paid.009.08 An Extra-Long Vehicle Combination permit fee shall be $ 250.00 for an annual permit. The annual permit fee will not be refunded after the permit is issued.408 Neb. Admin. Code, ch. 3, § 009
Adopted effective 4/30/2023