Section 408-1-006 - APPLICATION PROCESS
006.01 An application for a permit to harvest hay shall be made to the Department through the District Engineer or designee in charge of the geographic area where the right-of-way is located.
006.02 All submitted applications shall be complete and shall be accompanied by the items noted in Section 003 and shall include the permit fee.
006.02A When the owner(s) are signing for themselves or in designating an assignee, under Section 004.02, all owner(s) must sign the application.
006.03 The permit fee shall be $40. The Department shall annually review the adequacy of the fee based on actual application processing costs, permit reporting costs, and field observation costs.
006.04 The permit fee is not refundable.
006.05 All fees received under this rule and regulation by the Department shall be remitted to the State Treasurer for credit to the Highway Cash Fund.