229 Neb. Admin. Code, ch. 11, § 008

Current through September 17, 2024
Section 229-11-008

Within 45 days after the expiration date of the Certificate of Inspection of a boiler or pressure vessel, if a required inspection is not performed by a Special Inspector upon a boiler or pressure vessel pursuant to a policy of insurance of an insurance company or an inspection contract with the AIA for which the inspector works, the Department may, perform a special inspection and charge the owner-user the special inspection fee set forth in 229 NAC 7 §005.

229 Neb. Admin. Code, ch. 11, § 008

Amended effective 8/7/2016.