For Class V Injection Wells authorized by permit, monitoring requirements shall, at a minimum, include:
004.01 The analysis of the physical and chemical characteristics of the injected fluid with sufficient frequency to yield representative data on its characteristics;004.02 Installation and use of devices to monitor the injection pressure, flow rate and volume as specified by the Department;004.03 Demonstration of mechanical integrity pursuant to Chapter 18 of this Title at least once every five years during the life of the well;004.04 Monitoring of fluid level and the parameters chosen to measure water quality in the injection zone as specified by the Department; and004.05 Monitoring of wells adjacent to the injection site to detect any migration from the injection zone into an USDW as specified by the Department.122 Neb. Admin. Code, ch. 20, § 004