Mont. Admin. r. 36.14.504

Current through Register Vol. 21, November 2, 2024
Rule 36.14.504 - BREACH OR REMOVAL OF AN EARTH DAM
(1) The breach of an earth dam must be excavated down to the level of the natural ground and be able to pass the 100-year, 24-hour flood at a depth and velocity equivalent to the natural channel. However, the maximum width required may be the total removal of the dam.
(2) The sides of the breach must be excavated to a slope that is stable and consistent with the natural angle of repose of adjacent material abutting the dam or as determined by the engineer.

Mont. Admin. r. 36.14.504

NEW, 1988 MAR p. 2489, Eff. 11/24/88.

85-15-110, MCA; IMP, 85-15-210, 85-15-213, MCA;