Mont. Admin. r. 17.30.1362

Current through Register Vol. 21, November 2, 2024
Rule 17.30.1362 - MINOR MODIFICATIONS OF PERMITS
(1) Upon the consent of the permittee, the department may modify a permit to make the corrections or allowances for changes in the permitted activity listed in this rule, without following the procedures of ARM 17.30.1364, 17.30.1365, 17.30.1370 through 17.30.1379, 17.30.1383, and 17.30.1384. Any permit modification not processed as a minor modification under this rule must be made for cause and with a draft permit (ARM 17.30.1370) and public notice as required in ARM 17.30.1364, 17.30.1365, 17.30.1370 through 17.30.1379, 17.30.1383, and 17.30.1384. Minor modifications may only:
(a) correct typographical errors;
(b) require more frequent monitoring or reporting by the permittee;
(c) change an interim compliance date in a schedule of compliance, provided the new date is not more than 120 days after the date specified in the existing permit and does not interfere with attainment of the final compliance date requirement; or
(d) allow for a change in ownership or operational control of a facility where the department determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage, and liability between the current and new permittees has been submitted to the department;
(e) change the construction schedule for a discharger that is a new source. No such change may affect a discharger's obligation to have all pollution control equipment installed and in operation prior to discharge under ARM 17.30.1340;
(f) delete a point source outfall when the discharge from that outfall is terminated and does not result in discharge of pollutants from other outfalls except in accordance with permit limits;
(g) conform to ARM 17.30.1342 and 17.30.1343(1);
(h) incorporate conditions of a POTW pretreatment program that has been approved in accordance with the procedures in ARM 17.30.1413 (or a modification thereto that has been approved in accordance with the procedures in ARM 17.30.1426) as enforceable conditions of the POTW's permits; or
(i) incorporate changes to the terms of a CAFO's nutrient management plan that have been reviewed and approved in accordance with the requirements of 40 CFR 122.42 (e)(6).

Mont. Admin. r. 17.30.1362

NEW, 1989 MAR p. 2060, Eff. 12/8/89; AMD, 1992 MAR p. 1241, Eff. 6/12/92; TRANS, from DHES, 1996 MAR p. 1499; AMD, 2013 MAR p. 529, Eff. 4/12/13.

75-5-201, 75-5-401, MCA; IMP, 75-5-401, MCA;