Mo. Code Regs. tit. 8 § 30-3.050

Current through Register Vol. 49, No. 21, November 1, 2024.
Section 8 CSR 30-3.050 - Posting of Prevailing Wage Rates

PURPOSE: This amendment implements statutory changes to the Missouri Prevailing Wage Law enacted by the passage of HB 1729 (2018).

(1) Contractors and subcontractors engaged in public works projects shall post the applicable hourly rate of wages (the prevailing wage or the public works contracting minimum wage as provided in section 290.257, excluding rates on projects for which the engineer's estimate or the bid accepted by the public body for the total project cost is less than seventy-five thousand dollars ($75,000)) in a dry, accessible place within the field office at the site of the building or construction job. On public works projects for which no field office is needed or established, such as road construction, sewer lines, pipelines, and the like, a contractor/subcontractor may post the applicable hourly rates of wages at the contractor/subcontractor's local office or batch plant, so long as the contractor/subcontractor provides a copy of the prevailing hourly wage rates to any worker upon request. Applicable hourly wage rates must be posted and maintained in a clearly legible condition for the duration of the public works project as provided by law.

8 CSR 30-3.050

AUTHORITY: section 290.240, RSMo 1986.* Original rule filed Aug. 24, 1990, effective April 29, 1991.
Repealed by Missouri Register December 17, 2018/Volume 43, Number 24, effective 1/29/2019
Adopted by Missouri Register June 3, 2019/Volume 44, Number 11, effective 7/31/2019

*Original authority: 290.240, RSMo 1957, amended 1969.