PURPOSE: This rule provides the criteria used to determine whether standard design-build or modified design-build procedures will be used.
Selection procedure | Award criteria options |
Standard Design -Build Selection Procedures | Lowest price, adjusted low bid (price per quality point), meets criteria/low bid, weighted criteria process, fixed price/best design, best value. |
Modified Design-Build | Lowest price technically acceptable. |
7 CSR 10-24.100
*Original authority: 226.020, RSMo 1939; 226.030, RSMo 1939, amended 1965, 2003, 2004; and 227.107, RSMo 2002.