6 Miss. Code. R. 3-5.42

Current through October 31, 2024
Rule 6-3-5.42 - For ESPs that want to provide services through ESCs, GESPC and SSCs
A. Energy, Water & Operational Savings Data forms for any GESP or SSCs submitted in response to Project History and Client Reference form with descriptive filename beginning [ESP Name or acronym].9DATA.
B. Sample Savings Measurement and Verification Plan for a GESPC or SSC with descriptive filename beginning [ESP Name or acronym].10MVP.
C. Sample Investment Grade Energy Audit including detailed energy and economic calculations, with descriptive filename beginning [ESP Name or acronym].11IGA.
D. Sample Operations and Maintenance Manual with descriptive filename beginning [ESP Name or acronym].12OMM.
E. Sample Commissioning Plan with descriptive filename beginning [ESP Name or acronym].13CXP.
F. Sample Final Design Specification for an installed ECM with descriptive filename beginning [ESP Name or acronym].14SPEC.
G. Sample Customer Savings Report with descriptive filename beginning [ESP Name or acronym].15CSR.
H. Sample Customer Training Plan with descriptive filename beginning [ESP Name or acronym].16CTP.

6 Miss. Code. R. 3-5.42

Miss. Code Ann. § 31-7-14 (Supp. 2017).
Adopted 4/15/2018