Rule 6-3-5.39 - Technical Project Capabilities
A. Provide a sample Savings Measurement and Verification Plan from a completed GESP or SSC by the ESP including an estimate of the total number of measurement points currently being monitored by ESP for that project.
B. Provide a sample Investment Grade Energy Audit conducted by the ESP which includes detailed energy and economic calculations for ESPs wanting to implement GESPCs or SSCs.
C. Provide a sample Operations and Maintenance Manual developed by the ESP for a completed GESPC or SSC.
D. Provide a sample Commissioning Plan from a GESPC or SSC implemented by the ESP.
E. Provide a sample Final Design Specification for an installed ECM (e.g. HVAC, controls, etc.).
F. Provide a sample Customer Savings Report from a GESPC or SSC implemented by the ESP.
G. Provide a sample Customer Training Plan used in a GESPC or SSC implemented by the ESP.

6 Miss. Code. R. 3-5.39

Miss. Code Ann. § 31-7-14 (Supp. 2017).