The Mississippi Distributed Generation Interconnection Rule (MDGIR) sets forth standards to establish the technical and procedural requirements for Distributed Generator Facilities (DGFs) to be interconnected and operated in Parallel with the Electric Distribution System (EDS) owned or operated by Electric Utilities (EUs) in Mississippi under the jurisdiction of the Mississippi Public Service Commission (Commission). Capitalized terms used in this rule have the meaning specified in the section titled DEFINITIONS.
Miss. Code. tit. 39, pt. 4, subpt. I, ch. 1