Section 37-1-7501-04002-1801The layout sheet of the proposed work shall indicate the following as necessary:
1. A MDOT Project Number with respect to the site location;2. The actual limits of the proposed development (as applicable) with respect to the identified project using a second or larger layout sheet if necessary, and show the full limits of the property and the relative drainage basin (another layout sheet at smaller, but legible, scale if needed);3. Reference proposed site stationing with respect to stationing of the project (if applicable-for far-removed work, only the connection may apply);4. Reference the proposed site elevations with respect to the true elevations of the project (any deviation must be tied to established true elevation);5. Show details of the work*, especially relative to drainage systems-junctions, structures (flow line and inlet elevations, etc.);6. A legible print of the consulting Engineer's Registration Seal.37 Miss. Code. R. § 1-7501-04002-1801