Upon product approval, the producer shall be responsible for sending a copy of the shipping ticket or documentation otherwise specified in the Materials Division Inspection, Testing, and Certification Manual, with each shipment, for the Project Engineer and/or the Field Operations Branch of the Materials Division.
37 Miss. Code. R. § 1-7201-02100-106