The contractor will be allowed to qualify those contracts involving both land-based and water-based structures that cannot be easily separated, as long as the land-based portion of the contract is in excess of $10,000.
35 Miss. Code. R. 4-10-01-403
The contractor will be allowed to qualify those contracts involving both land-based and water-based structures that cannot be easily separated, as long as the land-based portion of the contract is in excess of $10,000.
35 Miss. Code. R. 4-10-01-403