15 Miss. Code. R. 10-76-2.9.1

Current through October 31, 2024
Rule 15-10-76-2.9.1

Special Inspectors shall, within one year of the effective date of these rules and regulations for power boilers and high pressure, high temperature water boilers and two years for other installations, submit to the Chief Inspector an inspection report on a Standard Form for states operating under the ASME Code, Boiler and Pressure Vessel Data Report -- First Internal Inspection, for each boiler and pressure vessel subject to inspection in this state. Complete data shall be submitted on this Standard Form for each nonstandard boiler or pressure vessel.

15 Miss. Code. R. 10-76-2.9.1

Miss. Code Ann. § 45-23-9