At the bid opening, each Bidder will be presumed to have inspected the site, read and become thoroughly familiar with the Drawings and the Project Manual, including all addenda.
12 Miss. Code. R. 3-2.1-0-00100-1-1.08
At the bid opening, each Bidder will be presumed to have inspected the site, read and become thoroughly familiar with the Drawings and the Project Manual, including all addenda.
12 Miss. Code. R. 3-2.1-0-00100-1-1.08