This part must be used when conducting existing system compliance inspections. This part defines what constitutes seepage pit, drywell, or leaching pit systems. Seepage pit, drywell, or leaching pit systems are not considered compliant systems as determined in part 7080.1500, subpart 4, item B, but these existing systems may be allowed continued use under Minnesota Statutes, section 115.55, subdivision 5a, paragraph (f), by local units of government that have adopted alternative local standards for these systems under part 7082.0050, subpart 5.
A seepage pit, drywell, or leaching pit is a system that:
Minn. R. agency 167, ch. 7080, pt. 7080.2550
Statutory Authority: MS s 115.03; 115.55