Within 60 days of certification of closure of the first hazardous waste disposal unit and within 60 days of certification of closure of the last hazardous waste disposal unit the owner or operator shall:
If at any time the owner or operator or a subsequent owner or operator of the land upon which a hazardous waste disposal unit is located wishes to remove the hazardous wastes and hazardous waste residues, the liner, if any, or contaminated underlying and surrounding soil, he or she must request a permit modification to amend the postclosure plan in accordance with the agency's permitting procedures in chapter 7001. The owner or operator must demonstrate that the removal of hazardous wastes will satisfy the criteria of part 7045.0492, subpart 3. If the owner or operator is granted approval to conduct removal activities, he or she may request that the commissioner approve either:
By removing hazardous waste and hazardous waste residue, the liner, if any, and the contaminated soil, the owner or operator becomes a generator of hazardous waste and shall manage it in accordance with all applicable requirements of this chapter.
Minn. R. agency 167, ch. 7045, FACILITY STANDARDS, pt. 7045.0496
Statutory Authority: MS s 14.07; 116.07