APLR = C x AWSAR x 0.001
Where,
APLR = Annual pollutant loading rate in kilograms per hectare per 365-day period.
C = Pollutant concentration in milligrams, per kilogram of total solids (dry weight basis).
AWSAR = Annual whole sludge application rate in metric tons per hectare per 365-day period (dry weight basis).
AWSAR = | APLR _____ C x 0.001 |
The procedure used to determine the AWSAR is described in subitems (1) to (4).
Minn. R. agency 167, ch. 7041, pt. 7041.3100
Statutory Authority: MS s 116.07