Part 7035.2610 - CONSTRUCTION CERTIFICATION

A new facility or any new design feature at an existing facility may not be opened or placed into operation until a construction certification has been approved by the commissioner. The construction certification must be signed by an engineer registered in Minnesota and the owner or operator. The construction certification must address the features modified during construction and the features constructed as approved in the permit. The certification must indicate the facility is operational. The certification must contain as-built plans, samples taken, test results, and an explanation why the facility or any part was modified. The commissioner must conduct site inspection before construction is certified.

Minn. R. agency 167, ch. 7035, SOLID WASTE MANAGEMENT FACILITY GENERAL TECHNICAL REQUIREMENTS, pt. 7035.2610

13 SR 1150

Statutory Authority: MS s 115.03; 116.07