Minn. R. agency 144, ch. 4761, LEAD STANDARDS; METHODS, pt. 4761.2580

Current through Register Vol. 49, No. 24, December 9, 2024
Part 4761.2580 - LEAD HAZARD REDUCTION NOTIFICATION
Subpart 1.General requirements.

The certified lead firm or lead supervisor conducting lead hazard reduction, or a property owner who will personally perform lead hazard reduction in or on the owner's property, must notify the commissioner of each project to be performed in whole or in part by the certified lead firm, lead supervisor, or property owner.

Subp. 2.Notification requirements.
A. The commissioner must receive from the certified lead firm, lead supervisor, or property owner a completed notification on a form provided by the commissioner.
B. The notice must be received by the commissioner at least five calendar days before the beginning of a project, except as provided in part 4761.2600.
C. The notice must be mailed, faxed, delivered, or electronically submitted to the commissioner.
D. The notice must also be provided to the assessing agency if lead hazard reduction was ordered by an assessing agency other than the Department of Health.
Subp. 3.Work schedule.

A certified lead firm, lead supervisor, or property owner performing lead hazard reduction must ensure that work is performed only during dates and work shifts for which the commissioner was notified.

Minn. R. agency 144, ch. 4761, LEAD STANDARDS; METHODS, pt. 4761.2580

29 SR 531

Statutory Authority: MS s 144.9508