Minn. R. agency 144, ch. 4660, PLANS, pt. 4660.0800

Current through Register Vol. 49, No. 20, November 12, 2024
Part 4660.0800 - FINAL MECHANICAL AND ELECTRICAL PLANS

Final mechanical and electrical plans and specifications shall cover the complete layout and type of all installations, systems and equipment to be provided in accordance with the requirements of these rules. Heating plans shall include heating elements, piping, thermostatic controls, pumps, tanks, heat exchangers, boilers, breeching, and accessories. Ventilation plans shall include room air quantities, ducts, fire and smoke dampers, exhaust fans, humidifiers, and air handling units. Plumbing plans shall include fixtures and equipment fixture schedule, water supply and circulating piping, pumps, tanks, riser diagrams, building drains, the size, location and elevation of water and sewer services, and the building fire protection systems. Electrical plans shall include fixtures and equipment, receptacles, switches, power outlets, circuits, power and light panels, transformers, and service feeders. Plans shall show location of nurse call signals, telephones, fire alarm stations and detectors, and emergency lighting.

Minn. R. agency 144, ch. 4660, PLANS, pt. 4660.0800

Statutory Authority: MS s 144.56; 144A.02 to 144A.08