If, after the January 1, 2015, filing, schedule C is the only change in the cogeneration and small power production tariff to be filed in a subsequent year, the utility may notify the commission in writing, by the date the tariff is due, that there is no other change in the tariff. This notification and new schedule C will serve as a substitute for the refiling of the complete tariff in that year.
Minn. R. agency 138, ch. 7835, FILING REQUIREMENTS, pt. 7835.0400
Statutory Authority: MS s 216A.05; 216B.08; 216B.164