Rule 2405. A permittee shall determine the cavity roof position not less than biennially. Generally accepted wireline logging methods shall be utilized. The results of the determination shall be filed with the supervisor of mineral wells not more than 60 days after completion and shall include all wireline logs run.
Mich. Admin. Code R. 299.2405