Current through Register Vol. 50, No. 9, September 20, 2024
Section XIII-2943 - Pressure Limiting and Regulating Stations: Capacity of Relief Devices [49 CFR 192.743]A. Pressure relief devices at pressure limiting stations and pressure regulating stations must have sufficient capacity to protect the facilities to which they are connected. Except as provided in §2939 B, the capacity must be consistent with the pressure limits of §1161. A This capacity must be determined at intervals not exceeding 15 months, but at least once each calendar year, by testing the devices in place or by review and calculations [ 49 CFR 192.743(a)].B. If review and calculations are used to determine if a device has sufficient capacity, the calculated capacity must be compared with the rated or experimentally determined relieving capacity of the device for the conditions under which it operates. After the initial calculations, subsequent calculations need not be made if the annual review documents that parameters have not changed to cause the rated or experimentally determined relieving capacity to be insufficient. [ 49 CFR 192.743(b)]C. If a relief device is of insufficient capacity, a new or additional device must be installed to provide the capacity required by Subsection A of this Section. [ 49 CFR 192.743(c)]La. Admin. Code tit. 43, § XIII-2943
Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:246 (April 1983), amended LR 10:538 (July 1984), LR 30:1271 (June 2004), LR 31:685 (March 2005), LR 33:482 (March 2007).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.